Blueprint: Blackhawk Tower Residence Hall, West Burlington, Iowa




Challenge:
Time was of the essence and HVAC equipment had to be pre-installed
to meet dormitory construction deadlines targeting the start of the
new school year.

Solution:
Daikin indoor units were pre-installed into modular pods that were shipped to final destination. Modules were assembled then connected to outdoor VRV heat recovery units. The selection of VRV qualified for approximately $28,000 of rebates from the local utility company.

Download Sponsored Whitepaper

Edit Module